NEW QUESTION 26
You can transfer inspection results from one inspection point to another when recording results.
- A. Incorrect
- B. Correct
Answer: B
NEW QUESTION 27
If inspection lots have already been created for the storage condition for future test dates that lie within in this inactive period, you must manually cancel these inspection lots.
- A. Incorrect
- B. Correct
Answer: A
NEW QUESTION 28
Statistical process control: Standardized statistical value for evaluating the quality of an inspection lot. The statistical value always has a specific reference criterion (such as a material or the material/vendor combination).
- A. Incorrect
- B. Correct
Answer: A
NEW QUESTION 29
Business Content has the following preconfigured objects (more than one answer is true):
- A. Characteristics
- B. Variables
- C. Key figures
- D. InfoCubes
Answer: A,C,D
NEW QUESTION 30
Which business object must you use to create a stability study?
- A. Physical sample
- B. Quality notification
- C. Quality inspection lot
- D. Sample drawing procedure
Answer: B
NEW QUESTION 31
Object management records enable changes to a certain object to be documented.
- A. Incorrect
- B. Correct
Answer: A
NEW QUESTION 32
During an audit you document a finding. In the audit structure, what can link an audit and a quality notification?
Please choose the correct answer.
- A. Business partner
- B. Audit question
- C. Corrective/preventive action
- D. Attached document
Answer: C
NEW QUESTION 33
On the basis of the vendor or manufacturer quality information stored for a particular material, the purchasing department can draw on quality-related information in addition to the standard criteria (price, and so on) when selection a vendor.
- A. Incorrect
- B. Correct
Answer: B
NEW QUESTION 34
Which statements are correct? (More than one answer is true.)
- A. Instead of using the quality notification to process the returned goods, you can create an inspection lot.
- B. Repairs Processing Using an Inspection Lot.
- C. If an inspection lot is used, the usage decision determines the next stage for the goods; if no inspection lot is used, a specific inventory posting can be made.
- D. You perform a defect analysis on the returned goods and enter the defects in the notification.
Answer: A,B,C
NEW QUESTION 35
Which statements are correct? (More than one answer is true.)
- A. Single authorization is required for the inspection lot, if the task list requires approval but has not yet been approved.
- B. The use of the material specification is dependent in the inspection setup in the Quality Management view of the material master.
- C. If additional material-dependent inspection specifications have to be stored for a particular material, a material specification can't be used.
- D. Object management records disable changes to a certain object to be documented.
Answer: B,D
NEW QUESTION 36
Which are belongs to Quality Notifications Activities? (More than one answers are true)
- A. Sample management
- B. Documentation
- C. Defect analysis
- D. Defects recording
- E. Results recording
- F. Priority
Answer: D,E
NEW QUESTION 37
The life cycle of a control chart are, (More than one answers are true)
- A. Creating additional inspection lots, inspection points and inspection results
- B. Calculating action limits
- C. Creating a control chart for the first inspection lot
- D. Creating inspection points and recording results
Answer: B,C,D
NEW QUESTION 38
Confirmation at Reporting point is available for ____.
- A. For all
- B. Discrete Manufacturing
- C. Process Manufacturing
- D. Repetitive Manufacturing
Answer: C
NEW QUESTION 39
The maintenance strategy can be time-based or but can not be performance-based.
- A. Incorrect
- B. Correct
Answer: A
NEW QUESTION 40
An inspection can be triggered at different stages in the logistics supply chain which includes...
- A. Goods movements (goods receipt, stock transfer, goods issue)
- B. Deadline monitoring (batch monitoring)
- C. Source inspections
- D. Orders (production orders, maintenance order, delivery)
Answer: A,B,D
NEW QUESTION 41
Which statements are correct? (More than one answers are true)
- A. In the procurement process, quality management is not involved in requests for quotation
- B. The QM System entered in the quality info record overrides the QM system entered in the vendor master record.
- C. You can define the QM system for the vendor in the vendor master record.
- D. The goods receipt posting for a certified vendor does not create an inspection lot.
Answer: C,D
NEW QUESTION 42
To access to all processing functions for the Audit Management data objects you have to use.
- A. PLMD_AUDIT
- B. PLMD_AUDITMONITOR
Answer: A
NEW QUESTION 43
Which statements are correct? (More than one answer is true.)
- A. ECC= Enterprise Core Components
- B. The SAP solution portfolio represents the entire lifecycle of a product, as well as the individual processes that are part of this lifecycle and relevant to QM
- C. SAP Office provides another alternative for managing the quality manual and related documents
- D. mySAP Enterprise Resource Planning (ERP) in the successor of SAP R/3.
- E. mySAP ERP covers all areas of a company
Answer: A,B,E
NEW QUESTION 44
You have determined a new business inspection process and need to customize a new inspection type Which of the following activities must you complete? Correct 2
- A. Define goods movement type
- B. Define default values for inspection type
- C. Assign inspection type to inspection lot origin
- D. Assign Task list type to material types
Answer: B,C
NEW QUESTION 45
Which Quality notifications origin Q1 belongs to
- A. none
- B. Customer complaint
- C. Complaint against a vendor
- D. Internal problem notification
Answer: B
NEW QUESTION 46
The dynamic modification rule defines the inspection stages and the conditions for an inspection stage change.
- A. Incorrect
- B. Correct
Answer: B
NEW QUESTION 47
When you assign the inspection methods to the master inspection characteristics, only inspection methods with a validity date that corresponds to the master inspection characteristic are proposed.
- A. Incorrect
- B. Correct
Answer: B
Explanation:
Explanation/Reference:
NEW QUESTION 48
What type of task lists can the calibration planner assign to a maintenance plan to perform a calibration inspection? Note : 2 correct answer
- A. Equipment task list
- B. Functional location task list
- C. Inspection plan
- D. Standard routing
- E. General task list
Answer: A,E
NEW QUESTION 49
......
C_TPLM40_65 Exam Certification Details:
| Cut Score: | 55% |
| Languages: | German, English |
| Duration: | 180 mins |
| Product Group: | SAP Business Suite |
| Exam: | 80 questions |
| Component: | Strategic Enterprise Management |
SAP C_TPLM40_65 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Implement QM in Discrete Manufacturing > 12% | Describe the unique processes for implementing QM in Discrete Manufacturing |
| QM in Process Industries < 8% | Describe the QM business processes used in Process Industries |
| Audit Management < 8% | Describe the process of Audit Management |
| Quality Notifications < 8% | Describe the purpose and features of Quality Notifications |
| Implement & Configure Quality Planning 8% - 12% | Explain the configuration requirements of Quality Planning |
| Sample Management < 8% | Describe the purpose and features of Sample Management. |
| Configuration and Organization < 8% | Configure Organizational elements used in QM |
| Quality Certificates < 8% | Describe the purpose and features of Quality Certificates |
| Implement & Configure Quality Inspection 8% - 12% | Explain the configuration requirements of Quality Inspection |
| Integration of QM and MM < 8% | Describe how QM integrates with Materials Management |
| Integration of QM with S&D and Service < 8% | Describe how QM integrates with Sales and Service |
| Implement & Configure Quality Control > 12% | Explain the configuration requirements of Quality Control |
C_TPLM40_65 Real Valid Brain Dumps With 82 Questions: https://www.validvce.com/C_TPLM40_65-exam-collection.html
Updated C_TPLM40_65 Dumps PDF: https://drive.google.com/open?id=1zdqZfZYagQGfv7yLPdcJciyf6RPikZMl