NEW QUESTION # 114
Which of the following principles is a part of the integrated process?

  • A. Cradle-to-cradle
  • B. Systems thinking
  • C. Project scheduling
  • D. Building information modeling

Answer: B


NEW QUESTION # 115
Which of the following standards addresses guidance for sustainable construction in complying with building codes?

  • A. ASHRAE 62.1
  • B. ASHRAE 90.1
  • C. ASHRAE 189.1
  • D. ASHRAE 72

Answer: C


NEW QUESTION # 116
Which strategy can be used during the building process and after occupation to reduce waste?

  • A. Develop a Sustainable Purchasing Policy
  • B. Use certified lumber for framing
  • C. Use grey water for flushing of toilets
  • D. Implement a recycling program

Answer: D


NEW QUESTION # 117
Which of the following practices ensures that building systems are designed efficiently, installed appropriately and operate as intended?

  • A. Building retrocommissioning
  • B. Positive feedback loop
  • C. Negative feedback loop
  • D. Building commissioning

Answer: D

Explanation:
Building commissioning is a quality assurance process that begins during the design phase and continues through construction, occupancy, and operation of the building. It ensures that the building's systems are designed efficiently, installed correctly, and operate as intended. The commissioning process involves a series of inspections, tests, and adjustments of building systems, followed by a review of the system design and operation with the building's operations team. Reference: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources


NEW QUESTION # 118
Which of the following interior items contributes to a comfortable acoustic environment?

  • A. Wood cabinets
  • B. Hollow metal doors
  • C. Soft surfaces
  • D. Glass cubicle partitions

Answer: C

Explanation:
Explanation
Soft surfaces contribute to a comfortable acoustic environment by absorbing sound waves and reducing noise levels. This can include items such as carpets, upholstered furniture, and acoustic ceiling tiles. In contrast, hard surfaces (like wood cabinets, hollow metal doors, or glass partitions) can reflect sound waves and increase noise levels. References: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources


NEW QUESTION # 119
Which of the fallowing projects is eligible for LEED for Building Operations and Maintenance; Existing Buildings?

  • A. An existing LEED certified building located on a college campus
  • B. A two-story LEED certified apartment building
  • C. A park adjacent to a LEED certified building
  • D. An existing single-family home that is LEED certified

Answer: A

Explanation:
Explanation
An existing LEED certified building located on a college campus is eligible for LEED for Building Operations and Maintenance; Existing Buildings (LEED O+M: EB). This rating system applies to existing buildings that are undergoing improvement work or little to no construction. It focuses on measuring and improving the performance of building operations and maintenance practices in areas such as energy efficiency, water conservation, waste management, indoor environmental quality, transportation, and occupant satisfaction. To be eligible for LEED O+M: EB, a project must meet certain minimum program requirements (MPRs), such as having a reasonable site boundary, being in a permanent location on existing land, being fully operational and occupied for at least one year prior to certification application, and complying with environmental laws and regulations. References: LEED certification for existing buildings and spaces6; Maintaining certification7; LEED v4: Building Operations + Maintenance Guide4


NEW QUESTION # 120
Which of the following strategies meets energy demand with renewable energy?

  • A. Implementing a composting program in an office break room
  • B. Installing a solar hot water heater
  • C. Purchasing Renewable Energy Certificates (RECs)from a clean coal plant
  • D. Incinerating waste to heat a home

Answer: B


NEW QUESTION # 121
What unit is green power purchased in?

  • A. Kilowatt-hour (kWh)
  • B. Megawatt-hour per square foot (MWh/sf)
  • C. British thermal units (BTUs]
  • D. Dollar amount of the purchase price

Answer: A

Explanation:
Explanation
Green power, like all electricity, is typically purchased in units of kilowatt-hours (kWh). This unit measures the amount of energy used over time. For example, a 1-kilowatt (1000 watts) appliance used for one hour consumes one kilowatt-hour of electricity. References: LEED Green Associate Candidate Handbook, U.S.
Green Building Council resources


NEW QUESTION # 122
A building owner has set a goal of reducing water use by 20% for the upcoming year. Which of the following strategies will aid in reducing indoor water demand to achieve the water reduction goal set by the owner?

  • A. Using potable water for flush functions
  • B. Collecting rainwater in cisterns
  • C. Installing dual-flush toilets
  • D. Installing building-level water meters

Answer: C

Explanation:
Installing dual-flush toilets can significantly reduce indoor water demand. Dual-flush toilets have two flush options: a half flush for liquid waste and a full flush for solid waste. By using less water for liquid waste, these toilets can reduce overall water consumption by up to 30%, helping to achieve the owner's water reduction goal. Reference: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources


NEW QUESTION # 123
What is the current standard LEED uses to determine the baseline for indoor water savings?

  • A. ANSI 17024
  • B. The local standard in which the project is located
  • C. Energy Policy Act (EPACT) of 1992. 2005
  • D. The Energy Savings and Industrial Competitiveness Act of 2013

Answer: C

Explanation:
The Energy Policy Act (EPACT) of 1992 set standards for indoor water fixtures like toilets and faucets, which are used as a baseline for determining water savings in LEED projects. The 2005 amendment to the EPACT further updated these standards. Reference: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources


NEW QUESTION # 124
An owner of newly acquired land wants to design a building that uses materials that have minimal impact on the environment. Which of the following strategies would help achieve this goal?

  • A. Environmental assessment
  • B. Life-cycle costing
    C Simple payback
  • C. Life-cycle assessment

Answer: C

Explanation:
Explanation
A life-cycle assessment (LCA) is a strategy that can help an owner of newly acquired land design a building that uses materials that have minimal impact on the environment. An LCA is a method that evaluates the environmental impacts of a product or material over its entire life cycle, from extraction to disposal. An LCA can measure the impacts on various categories, such as energy use, water use, greenhouse gas emissions, resource depletion, and waste generation. An LCA can help compare different products or materials based on their environmental performance and select the ones that have the lowest impact13. References: LEED v4 Green Associate Candidate Handbook1, EPA's Life Cycle Assessment3


NEW QUESTION # 125
An annual survey is given to the building occupants in which they are asked to rate their comfort level with regards to the heating and air-conditioning, acoustics, air quality, lighting levels and cleanliness. Which building staff member is best equipped to evaluate the responses and develop a corrective action plan to address problems and improve occupants' comfort?

  • A. LEED AP
  • B. Facilities Manager
  • C. Commissioning (Cx) Agent
  • D. Leasing Agent

Answer: B

Explanation:
The Facilities Manager is typically responsible for ensuring the comfort and safety of a building's occupants. They would be best equipped to evaluate responses to a survey about comfort levels in the building and develop a corrective action plan to address any problems identified. Reference: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources


NEW QUESTION # 126
The U.S. Green Building Council (USGBC) member logo may be displayed when

  • A. a professional successfully passes the LEED AP exam
  • B. the organization is a member of USGBC
  • C. a professional is a member of the local USGBC chapter
  • D. the project team successfully completes and certifies a project with the LEED Rating System

Answer: B

Explanation:
Explanation
The USGBC member logo may be displayed by an organization that is a member of the USGBC. Membership in the USGBC is organizational, not individual, so the logo represents the organization's commitment to sustainability and green building practices. References: LEED Green Associate Candidate Handbook, U.S.
Green Building Council resources


NEW QUESTION # 127
Which of the following demonstrates life-cycle approach to development or design?

  • A. Renovating an existing building using recycled and salvaged building materials
  • B. Locating a new building in a dense district with a diversity of uses and plentiful transit routes
  • C. Designing a building envelope with the most advanced technology to maximize insulation values, regardless of what materials are used
  • D. Purchasing and demolishing a 100-year-old apartment building to build a new. energy-efficient building

Answer: A

Explanation:
Renovating an existing building using recycled and salvaged building materials is an example of a life-cycle approach to development or design. A life-cycle approach is an approach that considers the environmental impacts of a product or a project from cradle to grave, or from extraction of raw materials to disposal or reuse. Renovating an existing building using recycled and salvaged building materials reduces the environmental impacts associated with new construction, such as land use change, resource depletion, energy consumption, waste generation, and greenhouse gas emissions. The LEED Green Associate Candidate Handbook states that one of the intents of the Materials and Resources category is to "promote life-cycle assessment as a means of evaluating environmental impacts" [1, p. 15]. Reference: LEED Green Associate Candidate Handbook, [Life Cycle Assessment | U.S. Department of Energy]


NEW QUESTION # 128
Good site design benefits a project in which of the following ways?

  • A. Makes occupants comfortable by providing green spaces
  • B. Supports access to diverse land uses, sustainable food and services
  • C. Provides access to public transportation and employment opportunities
  • D. Protects endangered species and maximizes development of previously undeveloped areas

Answer: A

Explanation:
Good site design benefits a project in which of the following ways: makes occupants comfortable by providing green spaces. Green spaces are areas of vegetation that improve the quality of life for building occupants and visitors by providing natural views, fresh air, shade, noise reduction, and recreational opportunities. They also reduce heat island effect, improve stormwater management, and sequester carbon dioxide. The LEED Green Associate Candidate Handbook states that one of the intents of the Sustainable Sites category is to "enhance occupant comfort by providing green spaces" [1, p. 13]. Reference: [LEED Green Associate Candidate Handbook], [Green Spaces | U.S. Department of Energy]


NEW QUESTION # 129
In a large site that has a short, intense rainy season and a long, dry season, what component of a collected rainwater irrigation system is most likely to make it cost prohibitive over a conventional system?

  • A. Landscaping plant selection
  • B. Irrigation piping systems
  • C. Rainwater storage cisterns
  • D. Irrigation control systems

Answer: C

Explanation:
Explanation
Rainwater storage cisterns are components of a collected rainwater irrigation system that are most likely to make it cost prohibitive over a conventional system in a large site that has a short, intense rainy season and a long, dry season. A collected rainwater irrigation system is a system that collects, stores, and distributes rainwater for irrigation purposes. Rainwater storage cisterns are containers that store the collected rainwater until it is needed for irrigation. In a large site that has a short, intense rainy season and a long, dry season, the rainwater storage cisterns would need to be very large and durable to capture and store enough rainwater for the dry season. This would increase the initial cost and maintenance cost of the system compared to a conventional system that uses potable water or groundwater for irrigation1 . References: LEED v4 Green Associate Candidate Handbook1, EPA's Rainwater Harvesting


NEW QUESTION # 130
A building owner has set a goal of reducing water use by 20% for the upcoming year. Which of the following strategies will aid in reducing indoor water demand to achieve the water reduction goal set by the owner?

  • A. Using potable water for flush functions
  • B. Collecting rainwater in cisterns
  • C. Installing dual-flush toilets
  • D. Installing building-level water meters

Answer: C


NEW QUESTION # 131
According to LEED. which of the following should be considered when locating a site for a project?

  • A. Economic stability
  • B. Political landscape
  • C. Revenue generating possibilities
  • D. Infrastructure context

Answer: D

Explanation:
According to LEED, one of the factors that should be considered when locating a site for a project is the infrastructure context. The infrastructure context refers to the existing physical systems that support a site, such as roads, utilities, transit networks, water supply, wastewater treatment, stormwater management, and waste disposal. Choosing a site that has access to adequate infrastructure can reduce the environmental impacts of developing new infrastructure, such as land disturbance, resource consumption, energy use, emissions, and pollution. The LEED Green Associate Candidate Handbook states that one of the intents of the Location and Transportation category is to "reduce environmental harm from transportation infrastructure" [1, p. 12]. Reference: LEED Green Associate Candidate Handbook, [Location and Transportation | U.S. Green Building Council]


NEW QUESTION # 132
In which of the following common building applications are chlorofluorocarbons (CFCs) found?

  • A. Insulation agents
  • B. Roof-top vents
  • C. Fire hydrants
  • D. Centrifugal chillers

Answer: D

Explanation:
Chlorofluorocarbons (CFCs) are a type of compound that was widely used in the 20th century in various applications, including as a refrigerant in air conditioning systems such as centrifugal chillers. CFCs are known to deplete the ozone layer when released into the atmosphere, and their use has been phased out in many countries under the Montreal Protocol. Reference: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources


NEW QUESTION # 133
Which class of refrigerants contributes the most to ozone depletion potential (ODP)?

  • A. Hydrochlorofluorocarbons {HCFCs}
  • B. Hydrofluorocarbons (HFCs)
  • C. Chlorofluorocarbons (CFCs)
  • D. Ammonia (NH3)

Answer: C

Explanation:
Explanation
Chlorofluorocarbons (CFCs) are the class of refrigerants that contribute the most to ozone depletion potential (ODP). Ozone depletion potential is a measure of how much a substance can damage the ozone layer in the stratosphere, which protects life on Earth from harmful ultraviolet radiation. CFCs are synthetic chemicals that contain chlorine, fluorine, and carbon atoms. They were widely used as refrigerants, aerosol propellants, solvents, and foam blowing agents until they were phased out by the Montreal Protocol due to their high ODP.
The LEED Green Associate Candidate Handbook states that one of the strategies for achieving energy and atmosphere efficiency is to "eliminate chlorofluorocarbons (CFCs) in new building HVAC&R systems" [1, p.
15]. References: LEED Green Associate Candidate Handbook, [Ozone Depletion Potential | U.S.
Environmental Protection Agency]


NEW QUESTION # 134
Which of the following credit categories does not have a prerequisite?

  • A. Water Efficiency
  • B. Indoor Environmental Quality
  • C. Location and Transportation
  • D. Materials and Resources

Answer: A

Explanation:
Water Efficiency is the only credit category that does not have a prerequisite in LEED v4 for Building Design and Construction. Prerequisites are the minimum requirements that all projects must meet to be eligible for LEED certification. They are mandatory and non-weighted, meaning they do not contribute to the project's score. The other credit categories have at least one prerequisite each, as shown in the table below:


NEW QUESTION # 135
......

Updated USGBC Study Guide LEED-Green-Associate Dumps Questions: https://www.validvce.com/LEED-Green-Associate-exam-collection.html