[Mar-2023] Latest ATLASSIAN ACP-620 exam dumps and online Test Engine
ATLASSIAN ACP-620: Selling Jira Administrator Products and Solutions
NEW QUESTION 56
As a project administrator, Razi can change these fields' layouts in his project by setting up their issue layout.
Which of the following are the three sections available in the issue layout settings? (Choose three.)
- A. Details
- B. Hide fields
- C. Description fields
- D. Required fields
- E. Context fields
- F. More fields
Answer: B,C,E
NEW QUESTION 57
Which of the following are the available scopes in Jira automation? (Choose four.)
- A. Project type
- B. Single project
- C. Multiple projects
- D. Issue type
- E. Multiple issue types
- F. All projects
Answer: A,B,C,E
NEW QUESTION 58
Nash recently joined the team as a scrum master.
Which permission will allow Nash to perform the below actions? (Choose four.)
- Manage version
- Manage component
- Manage sprint
- Edit an issue's due date
- A. Schedule Issues
- B. Manage Components
- C. Manage Sprints
- D. Manage Versions
- E. Administer Projects
- F. Edit Issues
Answer: A,C,E,F
NEW QUESTION 59
Jira automation helps users to automate repetitive manual works and focus more on the team's productivity.
Which of the following are true about Jira automation? (Choose three.)
- A. Users can create an automation to trigger other automations.
- B. Only the rule owner will receive an email notification if automation is failing.
- C. By default, the actor of the automation is the creator of the automation.
- D. Users can apply one automation to a single project only.
- E. Users can refer to the Audit Log to check automation logs.
- F. The automation owner will always receive an email if the automation is failing.
Answer: A,B,E
NEW QUESTION 60
Nina's team plans to complete 10 issues in the sprint. However, there are 2 issues still unresolved.
As a project administrator, what is the minimum permission Nina needs to complete the current sprint? (Choose four.)
- A. Schedule Issues
- B. Transition Issues
- C. Move Issues
- D. Browse Projects
- E. Manage Sprints
- F. Edit Issues
Answer: A,D,E,F
NEW QUESTION 61
According to the components below, who will be the assignee if a user created a ticket with all these components?
Project lead: Razi
Project default assignee: Project Lead
- A. Razi
- B. Nina
- C. Nick
- D. Unassigned
- E. Dom
Answer: C
NEW QUESTION 62
Which JQL query can users use to get a list of issues in the current sprint for the "Udemy" project?
- A. project = "Udemy" AND Sprint = activeSprint()
- B. project = "Udemy" AND Sprint in activeSprint()
- C. project = "Udemy" AND Sprint in openSprints()
- D. project = "Udemy" AND Sprint = openSprints()
Answer: C
NEW QUESTION 63
Which of the following are false about the roadmap? (Choose three.)
- A. Users can change the view setting to customize their roadmap's view. The changes will apply to all users that have access to that project.
- B. Schedule bars for child issues are currently available for scrum teams only.
- C. Users can choose which epics they want to display on the dashboard. Either Complete or Incomplete.
- D. Users can change the epic bar timeline to weeks, months, quarters, or yearly.
- E. Users can customize epic's color directly from the roadmap.
Answer: A,C,D
NEW QUESTION 64
As a scrum master, Sarah needs access to manage a sprint and rank an issue.
According to this table, how many roles need to be assigned to Sarah?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: A
NEW QUESTION 65
Razi is creating a new Kanban board with multiple Jira projects. Some of the issues are missing from the board.
Which of the following are true? (Choose two.)
- A. The user does not have the 'Browse Projects' permission for some projects.
- B. Some issues have 'Issue Level Security' applied.
- C. The user does not have the 'View Issues' permission for some projects.
- D. Some statuses are not properly mapped to the correct column.
Answer: A,B
NEW QUESTION 66
Razi accidentally deleted a column from the board. Assuming he has full access to manage the board, which of the following is true?
- A. Some issues will be deleted.
- B. The number of issues in the report will change.
- C. All answers are incorrect.
- D. Statuses associated with that column will be deleted.
- E. The user cannot delete a column that contains at least one status.
Answer: C
NEW QUESTION 67
Which of the following are the best scenarios to use Custom Field more than the Component? (Choose three.)
- A. The project administrator will manage the new field.
- B. The user can only select a single option from the new field.
- C. The assignee must be automatically populated based on the selected value.
- D. The Jira administrator will manage the new field.
- E. All Jira projects can add this new field to their issue screen.
Answer: B,D,E
NEW QUESTION 68
Which of the following are valid permissions in Jira? (Choose three.)
- A. User Permissions
- B. Global Permissions
- C. Project Permissions
- D. Jira Permissions
- E. Issue Security Permissions
Answer: B,C,E
NEW QUESTION 69
Users created a new custom field called 'Position' that has two values:
- Manager
- Non-Manager.
They need a graphical report to group issues from Manager and Non-Manager, and then apply a saved filter.
Which report can they use to generate the relevant information?
- A. Time Since Issues Report
- B. Pie Chart Report
- C. Resolution Time Report
- D. Time Tracking Report
- E. Single Level Group By Report
- F. Average Age Report
Answer: B
NEW QUESTION 70
In the current sprint, users have 10 issues but their team is only able to complete 5 issues.
What will happen to the other 5 issues if they wish to complete the current sprint? (Choose two.)
- A. Users can move them to their backlog.
- B. Unresolved issues will be removed.
- C. Users can move them to the other active sprints.
- D. Users can move them to the next sprint.
- E. Unresolved issues will be archived.
Answer: B,E
NEW QUESTION 71
Nina recently joined as a finance manager. Her team already has a few Jira projects running that is related to finance projects. She needs to create a new project using the same configurations as the other finance projects.
Below is the configuration she used to create the project.
What will happen to Nina's Jira project (RMC) if the team that is managing the USC project changed their Jira configuration?
- A. All answers are incorrect.
- B. Nothing will happen. Jira will only apply the configuration changes at the initial Jira project creation.
- C. Nina has permission to accept the configuration changes if she needs them.
- D. Any changes with the other team's Jira project will automatically apply to Nina's Jira project.
Answer: C
NEW QUESTION 72
Razi's team just completed their first sprint.
What can they learn from this chart? (Choose three.)
(Assume Remaining Estimate and Time Spent is disabled for this board.) This sprint ends with 0 story points.
- A. Some of the issues are still unresolved.
- B. Some of the issues are resolved during non-working days.
- C. There are 2 issues resolved on July 8th.
- D. This sprint starts with 20 story points.
- E. There are no scope changes in this sprint.
Answer: B,D,E
NEW QUESTION 73
A group of developers are working on multiple Jira projects. They can view all Jira projects and have the 'Move Issues' permission in all Jira projects. However, they cannot move issues to some of the Jira projects.
What is the possible root cause of this problem?
- A. They do not have the 'Transition Issue' permission in some projects.
- B. They do not have the 'Edit Issue' permission in some projects.
- C. They do not have the 'View Issue' permission in some projects.
- D. They do not have the 'Create Issue' permission in some projects.
Answer: D
NEW QUESTION 74
Dom is a project manager for some projects. He needs his board to display management-related issues using Jira components. The changes should also be applied to his Cumulative Flow Diagram report.
Which feature can he use to achieve this?
- A. Board Sub-Filter
- B. Board Filter
- C. Quick Filters
- D. Swimlanes
- E. Hide completed issues
- F. Issue Detail View
Answer: B
NEW QUESTION 75
Based on the below diagram, which statement is true about issues on July 25th?
There are 6 issues in the 'To Do' status.
- A. All answers are incorrect.
- B. There are 5 issues in the 'To Do' status.
- C. There is no issue in the 'To Do' status.
- D. There are 11 issues in the 'To Do' status.
- E. There are 4 issues in the 'To Do' status.
Answer: E
NEW QUESTION 76
Nina is a new hire that will be working on a Jira project. Her manager assigned the below task to her:
- Assign issues to other members
- Nina should not work on any issues
- Move issue's status to other statuses.
What are the minimum permissions that Nina needs to meet these 3 requirements? (Choose two.)
- A. Assign Issues
- B. Edit Issues
- C. Assignable User
- D. Administer Projects
- E. Move Issue
- F. Transition Issue
Answer: A,F
NEW QUESTION 77
As a project manager, Dom is responsible in monitoring all issues that have been assigned to his team are on track and the Time Estimation for each issue is correctly measured.
Which of the following is the best report that he can use to ensure Time Estimation and Time Spent by his team on issues are on track?
- A. Time Since Issues Report
- B. Resolution Time Report
- C. Single Level Group By Report
- D. Average Age Report
- E. Time Tracking Report
- F. Pie Chart Report
Answer: E
NEW QUESTION 78
New developers will join a team to work on a web application project. As a project administrator, Dom needs to ensure he has the proper access to control their permission.
Which of the following should Dom add to the project permission scheme?
- A. Groups
- B. Roles
Answer: B
NEW QUESTION 79
A Jira workflow contains 3 statuses; To Do, In Progress, and Done.
Dom needs to get all reopened issues and assign those issues to his team.
Which of the following JQL does Dom need to use?
(Assume reopened issues will be transitioned to 'To Do' status)
- A. status was not in ("In Progress", "Done")
- B. status was Done AND status = "To Do"
- C. status = Reopened
- D. status changed from Done to "To Do"
- E. status = "To Do" AND resolution is EMPTY
Answer: B
NEW QUESTION 80
......
New 2023 ACP-620 Test Tutorial (Updated 149 Questions): https://www.validvce.com/ACP-620-exam-collection.html
Reliable ACP-620 Exam Tips Test Pdf Exam Material: https://drive.google.com/open?id=1HfVslqh0Vu7axnmZ7hOsvetSpksajhJv